The Environmental Assessment and Licensing Branch receives proposals pursuant to The Manitoba Environment Act and The Dangerous Goods Handling and Transportation Act and invites public participation in the review process.
Proposals are currently under review from the following operations. Please note that public registries may receive the materials a few days after this page has been updated.
The addresses and phone numbers for all public registry locations are listed at Library Services.
| File# | Proposal Name | Proponent | Date: Proposal Filed/TAC Review Started |
Comments Due | Advertisement | Location of Sub-Public Registries* & Project Contact |
| 5433.00 | BiPole III Transmission |
Manitoba Hydro | December 2, 2011 December 5, 2011 |
March 16, 2012 | On December 2, 2011, Manitoba Hydro filed an EIS for the Bipole III Transmission Project: A Major Reliability Initiative (the Project). The Project is required to ensure the reliability and security of Manitoba’s transmission and power supply system. It involves: the construction of a new 500 kV high-voltage DC transmission line; two new converter stations (Keewatinoow in the north and Riel in the south); 230 kV collector transmission lines; and, two ground electrodes with connections to the converter stations. Prior to submitting the EIS, Manitoba Hydro engaged in a detailed Site Selection and Environmental Assessment (SSEA) process. The SSEA included four rounds of consultation in order to obtain public input before selecting a final preferred route. The EIS was prepared in accordance with an Environmental Assessment Scoping Document which was approved by Manitoba Conservation in June 2010. Results of the SSEA, the environmental field studies and the project assessment are provided in the EIS. |
Main/Millennium Public Library/Manitoba Eco-Network/Thompson Public Library/MKO/The Pas Public Library/Dauphin Public Library/Northwest Regional Library/Minitonas Library/Snow Lake and Gillam Town Offices/Tataskweyak Cree Nation Band Office Western Manitoba Regional Library/Jake Epp Public Library/Portage la Prairie Public Library/Electronic Registry Contact person: Elise Dagdick @ 945-8173 |
| 5544.00 | Waskada to Pierson Pipeline Project | EOG Resources Canada Inc. | December 21, 2011 January 4, 2012 |
February 17, 2012 | A Proposal has been filed by EOG Resources Canada Inc. to construct and operate three pipelines in one 32 km long right-of-way from SW 1-2-28 W1M to the existing oil battery in NE 21-1-25 W1M. The proposed right-of-way traverses the Rural Municipalities of Edward, Arthur, and Brenda. The pipelines in the right-of-way would include a 168.3 mm diameter sweet natural gas pipeline, a 219.1 mm diameter oil pipeline, and a 114.3 mm diameter sour gas pipeline. Construction of the project is anticipated to begin in spring of 2012. Completion is targeted for the fourth quarter of 2012. |
Main/Millennium Library/Eco-Network/ Contact person: Elise Dagdick @ 945-8173 |
| 5558.00 | Crop Protection Products Warehouse – Portage la Prairie | United Agri Products Canada d/b/a Access Distribution |
January 10, 2012 January 12, 2012 |
March 5, 2012 | An Environment Act Proposal has been filed by United Agri Products Canada Inc. d/b/a Access Distribution for the operation of a Crop Protection Products Warehouse Development located at 815 Phillips Street in the City of Portage la Prairie, Manitoba. The development will consist of a 24,000 square foot (2,230 square metre) crop protection products warehouse. The development will be used for the storage of various crop protection products including: herbicides, insecticides, fungicides, rodenticides, adjuvants, plant growth regulators, plant nutrients, seed treatments, inoculants, fertilizers and crop seeds. |
Main/Millennium Library/Eco-Network/Portage Regional Library Contact Person: Randy Webber @ 945-7107 |
| 5560.00 | Concrete Batch Plant | JTI Trucking (5304083 MB Inc.) |
December 1, 2011 January 11, 2012 |
March 9, 2012 | A proposal has been filed by Mr. Tom Bueckert, on behalf of JTI Trucking for the construction and operation of a concrete batch plant at 33 Clearspring Road in Steinbach. The facility will produce ready mix concrete for use in construction projects in the Steinbach area. |
Main/Millennium Library/Eco-Network/ |
| 5561.00 | Notre Dame De Lourdes Composting Site | Village of Notre Dame de Lourdes |
December 21, 2011 January 16, 2012 |
March 6, 2012 | A proposal has been filed by J.R. Cousins Consultants Ltd., on behalf of the Village of Notre Dame de Lourdes for the construction and operation of a compost facility at NE 32-6-8 WPM in the RM of Lorne. The facility will generate compost from yard and kitchen waste. |
Main/Millennium Library/Eco-Network/ |
| 5562.00 | R.M. of De Salaberry Composting Site | R.M. of De Salaberry | December 21, 2011 January 16, 2012 |
March 6, 2012 | A proposal has been filed by J.R. Cousins Consultants Ltd., on behalf of the R.M. of De Salaberry for the construction and operation of a compost facility at NE 14-5-4 EPM in the R.M. of De Salaberry. The facility will generate compost from yard and kitchen waste. |
Main/Millennium Library/Eco-Network/ |
| 5563.00 | Syngas Demonstration Project | Pineland Forest Nursery | December 21, 2011 |
March 12, 2012 | A proposal has been filed by Trevor Stanley, on behalf of the Pineland Forest Nursery for the construction and operation of a gasifier to convert woody biomass to syngas at NE 9-8-12 EPM in the Rural Municipality of Reynolds. The syngas will be used to fuel two generators to produce combined heat and power. The facility has the potential for air emissions. |
Main/Millennium Library/Eco-Network/ |
| 5556.00 | Brady Road Recycling Facility | City of Winnipeg | December 23, 2011 January 18, 2012 |
March 12, 2012 | A proposal has been filed by the City of Winnipeg to construct, operate and manage the existing Waste Disposal Facility located east of Brady Road, south of the Perimeter Highway and west of Waverley Street in the City of Winnipeg. The Development will consist of municipal landfill cells, a leachate collection and removal system, a waste transfer/drop-off area, a recyclables collection area, a compost facility for leaf and yard waste, a landfill gas collection system, storage areas for used tires, batteries, bicycles, scrap metals, white goods, propane tanks, green waste, and street sweepings, a weigh scale house, engineered wetlands and areas for stockpiling cover material. The city currently accepts at the landfill: household garbage; construction and demolition (C&D) waste; industrially or commercially derived non-hazardous and non-putrescible wastes; wood; furniture; metal; and acceptable yard wastes from residences. Special wastes such as dead animals including specified risk material (SRM), asbestos-containing materials (ACM) and biosolids are also accepted. |
Main/Millennium Library/Eco-Network Contact Person: Noor Barsha @ 945-8702 |
| 5565.00 | Wastewater Treatment Lagoon | Suncrest Holding Co. Ltd. | January 16, 2012 January 30, 2012 |
March 15, 2012 | A proposal has been filed on behalf of Suncrest Holding Co. Ltd. pursuant to The Environment Act for the construction and operation of a new domestic wastewater treatment lagoon located in the southeast quarter of Section 25-6-4 EPM in the Rural Municipality of De Salaberry, to serve the Suncrest Colony. The proposed development will consist of the construction of a new primary cell and a new secondary cell. Treated effluent from the wastewater treatment lagoon will be trickle discharged between June 15th and November 1st of any year into a field drain which flows to the east into a municipal drainage system (2nd order drain). The municipal drainage system will then convey the effluent to the northeast where it ultimately empties into the Tourond Creek approximately 2 km from the site. |
Main/Millennium Library/Eco-Network/ |
*All material is placed in public registries at the Manitoba Eco-Network Library, the Winnipeg Public Library, and the Conservation and Environment Library.