Manitoba Exploration Activity Tracker
Manitoba Exploration Activity

Reed Lake

Commodity: Copper, Zinc
UTM Easting: 390400
UTM Northing: 6050600

Related news releases:

RNC Announces Strong Operating Results at Beta Hunt and Reed Mines and Appointment of Kevin Small as Director, Mining Operations
September 6, 2016

RNC Completes Acquisition of VMS Ventures
April 27, 2016

VMS Ventures Provides Update on Reed Mine
September 21, 2015

VMS Reports Update on Reserves and Resources at Reed Mine
April 1, 2015

VMS Reports January Reed Mine Highlights
February 20, 2014

VMS Ventures Provides Reed Mine December Update
January 20, 2014

VMS Ventures Updates Progress at the Reed Copper Project
May 3, 2013

VMS Ventures Updates 2013 Winter Drill Programs, Snow Lake, Manitoba and Sudbury, Ontario
May 1, 2013

VMS Ventures Updates Progress at the Reed Copper Project, Manitoba: $30 Million Invested in the Project
April 11, 2013

VMS Ventures Finalizes Upcoming 2013 Winter Drill Program on Its 100% Owned Manitoba Properties
January 17, 2013

VMS Ventures Announces 2013 Winter Drilling Program Including Reed East and Reed West Targets Near Snow Lake, Manitoba
December 5, 2012

VMS Ventures Updates the Reed Copper Project Which Remains Within Budget and on Schedule; Winter Drilling Budget Set
October 31, 2012

VMS Ventures Announces Reed Exploration Properties Joint Venture With Hudbay
October 23, 2012

VMS Ventures Updates Progress at the Reed Copper Project Near Snow Lake, Manitoba
July 19, 2012

VMS Acquires Large Land Package Adjacent to the Reed Copper Mine Property, Snow Lake, Manitoba
June 21, 2012

VMS Ventures Inc.: Reed Copper Project Positive Pre-Feasibility Study Completed
April 2, 2012

Hudbay Releases Fourth Quarter 2011 Results
March 7, 2012

VMS Ventures Provides Permit Update at the Reed Copper Deposit Near Snow Lake, Manitoba
January 26, 2012

VMS Ventures Provides Exploration Target Update at the Reed Copper Deposit and Option Properties Near Snow Lake, Manitoba
January 18, 2012

New Geophysical Targets At, and Near, the Reed Copper Deposit Snow Lake, Manitoba
December 19, 2011

VMS Reports 3.95 m of 9.31% Cu at Reed North in the Super Zone Property, Near Snow Lake, Manitoba
September 29, 2011

VMS Updates Progress on its 2011 Exploration Programs in the Flin Flon-Snow Lake Greenstone Belt, Manitoba
September 9, 2011

VMS Reports 5.94% Copper Over 2.23 Metres in Drill Hole RLE007 From Follow-Up Drilling of New Copper Zone Located 1.8 Kilometres Northeast of the Reed Copper Deposit
August 9, 2011

VMS Ventures Intersects Second Copper Occurance at Cowan River Snow Lake, Manitoba
July 28, 2011

VMS Reports Discovery of New High Grade Copper Zone Grading 7.44% Copper Over 7.18 Metres in Hole RLE006 Located 1.8 Kilometres Northeast of the Reed Copper Deposit
May 17, 2011

VMS Updates Progress on its 2011 Exploration Programs in the Flin Flon - Snow Lake Greenstone Belt, Manitoba
May 9, 2011

VMS Announces NI 43-101 Mineral Resource for the Reed Lake Deposit at 2.55 Million Tonnes @ 4.52% Copper in the Indicated Category/HudBay and VMS Drilling Continues
April 1, 2011

VMS Reports 37.10 Metres of 5.60% Copper From In-Fill Hole RLD024 at Reed Lake Joint Venture
February 23, 2011

VMS Reports 28.05 Metres of 4.85% Copper from In-Fill Hole RLD021 at Reed Lake Joint Venture
January 31, 2011

VMS Ventures Reports Mineralization at 30 Metres From Surface in Zone 30 (Zinc-Copper Lens), Including 15.7m of 6.57% Zinc, From Initial In-Fill Drilling at Its Reed Lake Joint Venture Project
December 16, 2010

VMS Reports That the First Step Out Drill Hole at Reed Lake Has Intersected 10 Metres of 2.39% Copper 214 Meters Down Plunge of the Reed Lake Deposit
December 10, 2010

VMS Reports 6.69% Copper Over 71.69 Metres and 3.74% Copper Over 21.77 Metres from In-Fill Diamond Drillholes Three and Four at the Reed Lake Joint Venture Property
October 28, 2010

VMS Receives First In-Fill Drill Results From Reed Lake Joint Venture Project-Reports 9.90 Metres of 5.56% Copper and 38.55 Metres of 3.81% Copper; $3 Million Exploration Program Approved
September 27, 2010

VMS Updates Reed Lake Drilling and Its Plans for Sails Lake, Morton Lake and the Copper Project
September 2, 2010

VMS Ventures Outlines Plans for Diamond Drilling at the Copper-Rich Reed Lake Joint Venture Property
August 10, 2010

HudBay Announces Joint Venture With VMS Ventures
July 6, 2010

HudBay Enters Into Letter of Intent With VMS Ventures
March 4, 2010

VMS Reports Drilling Has Commenced at Its Super Zone Properties, Near Snow Lake, Manitoba
February 18, 2010

VMS Announces Preparations for Phase 2 Drilling at the Reed Lake Tower Zone and Drill Plans for Its Sails Lake and Copper Projects Near Snow Lake, Manitoba
February 4, 2010

Reed Lake Discovery Zone Stratigraphy Extends Through the Tower Zone, Near Snow Lake, Manitoba
January 13, 2010

VMS Ventures to Begin Phase One Drilling on the Tower Zone at the Reed Lake Property, Snow Lake Manitoba
October 30, 2009

VMS Ventures to Drill Five Large Conductor Plate Models in a Two Phase Program On, and Near, Its Tower Zone Property
October 15, 2009

VMS Ventures Updates Tower Zone Drill Progam Planning; Geochemical Anomalies Over Deep Conductors at Reed Lake Properties, Snow Lake, Manitoba
September 25, 2009

VMS Ventures Reports Drill Targets Identified on Its 100% Owned Tower Zone Property
September 18, 2009

Geophysical Survey Extends Tower Zone Anomaly 600 Metres Further to the South and to the North and East, on 100% VMS Ventures Ground, Near the Reed Lake Discovery, Snow Lake Manitoba
August 12, 2009

VMS Identifies a Two km Long Geophysical Target At Reed Lake Project Near Snow Lake Manitoba
March 12, 2009

VMS Announces Silver and Gold Results From Its Reed Lake Discovery Near Snow Lake, Manitoba
February 25, 2009

2 km Long Horizon to Be Explored With Deep EM Geophysical Survey Southwest of Reed Lake Discovery Zone, Snow Lake, Manitoba
January 22, 2009

VMS Ventures Reports Strong Anomaly South-West of Reed Lake Discovery Zone Near Snow Lake, Manitoba
January 15, 2009

VMS Ventures Inc.: Drill Hole RD-08-73 Intersects 11.70 Metres of 6.12% Copper, at Reed Lake Discovery Zone, Snow Lake, Manitoba
December 10, 2008

VMS Completes Property Purchase Agreement for the Acquisition of Reed Lake Claims With W. Bruce Dunlop Ltd.
December 8, 2008

VMS Ventures Inc.: Drill Hole RD-08-71 Intersects 39.71 Metres of 4.04% Copper, at Reed Lake Discovery Zone, Snow Lake Manitoba
November 26, 2008

VMS Enters Into a Letter of Intent for the Acquisition of Reed Lake Claims With W. Bruce Dunlop Ltd.
November 4, 2008

VMS Ventures Inc.: Drill Hole RD-08-65 Intersects 99.32 Metres of 1.08% Copper, at Reed Lake Discovery Zone, Snow Lake, Manitoba
October 29, 2008

VMS Ventures Inc.: Drill Hole RD-08-64 Intersects 14.47 Metres of 3.27% Copper at Reed Lake Discovery Zone, Snow Lake Manitoba
October 21, 2008

VMS Ventures Inc.: Drill Hole RD-08-61 Intersects 100.19 Metres of 3.59% Copper, Including 9.71 Metres of 17.79% Copper at Reed Lake Discovery Zone, Snow Lake, Manitoba
October 1, 2008

RD-08-55 Intersects 61.96 Metres of 5.96% Copper at VMS Discovery Zone Near Snow Lake, Manitoba
September 23, 2008

RD-08-51 Intersects 97.21 Metres of 2.08% Copper at Discovery Zone, Snow Lake, Manitoba
September 4, 2008

RD-08-71 Intersects 39.71 Metres of Mineralization Down to 450 Metres Below Surface at Reed Lake Discovery Zone, Snow Lake, Manitoba
September 3, 2008

RD-08-51 Through RD-08-56 Contain Intersections of Near Solid Sulphides or Sulphide Veinlets at Reed Lake, Manitoba
July 31, 2008

VMS Reports 10.36% Copper Over 33.46 Metres in Deepest Intercept to Date at Reed Lake, Manitoba
July 3, 2008

VMS Reports 19.8 Meters Grading 2.70% Copper in Hole RD-08-35 at Reed Lake Discovery Zone
June 19, 2008

RD-08-36 Contains 81.07 m of 3.54% Copper and RD-08-41 Intersects 22.74 m of NSS at 360 m Below Surface at Reed Lake Discovery Zone
May 22, 2008

VMS Signs 10,000 Meter Drill Contract With Rodren Drilling Ltd.
May 15, 2008

Reed Lake Discovery Zone Update to Shareholders
May 8, 2008

VMS Reports 102.5 M of 1.09% Copper in RD-08-33 and 12.55 M of 2.01% Copper in RD-08-29 at Reed Lake, Manitoba
May 6, 2008

VMS Resumes Drilling at Reed Lake Discovery Zone, Snow Lake, Manitoba
May 1, 2008

VMS Reports 35.8m of 2.69% Copper at Reed Lake, Manitoba; Dr. Mark Fedikow Joins Management Team
April 23, 2008

VMS Completes Phase 3 Drill Program
April 10, 2008

Hole RD-08-26 Assays 21.15m of 2.57% Cu and 3.13% Zn; RD-08-22 Assays 25.67m of 0.96% Cu and 4.37% Zn and Hole 08-34 has 35.73m of NSS
March 20, 2008

VMS discovers 2.25% Copper, 3.17% Zinc and 1.39 g/t Gold over 51.98m (170.54 ft), including 8.49% Copper, 5.07% Zn and 4.91 g/t Gold over 4.57m (14.99 ft)
March 3, 2008

Holes RD 08-25, RD 08-26 and RD 08-30-30 Intersect Near Solid Sulphides: Assays Now Pending on 7 Holes
February 19, 2008

Hole RD 07-12 Assays 31.74m of 2.09% Cu and 3.56% Zn; Hole RD 08-22 Intersects 25.75m NSS at Discovery Zone
February 6, 2008

6 Holes Intersect Near Solid Sulphides; Assay Results for Two at Reed Lake, Manitoba Discovery Zone
January 29, 2008

VMS Ventures Inc. to Commence Large VTEM Airborne Survey Over Snow Lake VMS Belt Properties, and Nickel Properties in Manitoba
January 3, 2008

2nd Drill Mobilized at Discovery Zone; Control Grid Underway Near Snow Lake, Manitoba
December 4, 2007

VMS Snow Lake, Manitoba Exploration Update
November 22, 2007

Drilling at Reed Lake Discovery Zone to Commence Monday
November 1, 2007

VMS Discovery Extended, Drill Equipment Arrives on Reed Lake Property, Snow Lake, Manitoba
October 25, 2007

2nd Drill Program Planned at Reed Lake Discovery Zone, Snow Lake, Manitoba
October 15, 2007

10.50 Metres of 11.19% Copper Within 43.05 Metres of 4.38% Copper in Drill Hole 2, at VMS Ventures Reed Lake Property, Snow Lake, Manitoba
October 4, 2007

VMS Ventures Inc. Exploration Update at Reed Lake Property, Manitoba
September 17, 2007

VMS Ventures Inc. Exploration Update at Copper-Zinc Properties, Snow Lake Mineral Belt, Manitoba; McWilliam Appointed to Board
August 16, 2007

More on Royal Nickel Corporation

More on HudBay Minerals Inc.