To view PDF files, you must have a copy of the Adobe Acrobat Reader which is available as a free download.
![]()
EOG Resources Pipeline Application Waskada to Pierson
- Application
- Header Tie In
- Piping Boundaries
- Gas Analysis
- Oil Analysis
- Raw Gas Analysis
- Flow Schematic 1
- Flow Schematic 2
- Flow Schematic 3
- Flow Schematic 4
- Flow Schematic 5
- Process & Instrumentation Diagram
- Map 1
- Map 2
- Petroleum Map
- Pipe List
- Pierson Plot
- Waskada Lease
- Battery Survey
EOG Resources 04-01-02-28 Battery Application
Tundra 13-10-09-28 Battery Application
- Application
- Land owner letter
- Gas Analysis 1
- Gas Analysis 2
- Air Dispersion
- Flow Schematic
- Flow Schematic
- Plot Plan
- Survey
Magellan 03-34-12-27 Battery Application
Enbridge Pipeline Application 16-10-09-28 to 15-10-09-28
Reliable- 4-16-13-28W1 Battery Application
EOG Resources- Pipeline Application- Souris River Crossing from
14-20-1-26 WPM to 4-30-1-26 WPMTundra Oil & Gas Partnership- Proposed New Pipeline Project- Daly Sinclair Field
Birdtail Battery Application 8-30-16-27
- Air Dispersion
- Battery Application
- Drawing 1
- Drawing 2
- Flow Schematic
- H2S Gas Analysis
- Screen 3 Modeling
- Survey Platte
Enbridge Pipelines Inc- Pipeline Application 4-20-09-25 to 16-36-09-26 WPM
Penn West Exploration-Pipeline Application 11-30-01-25 to 12-30-01-25 WPM
Black Gold Battery Application 02-27-08-28 WPM
T. Bird Kirkella 08-16-11-29 WPM
EOG Resources Canada Inc. - Battery Application 16-21-01-25 WPM - Waskada
White North Energy Corp. Battery Application for Daly Sinclair 05-27-08-28 WPM
EOG Resources Canada Inc. - Battery Application 16-21-01-25 WPM - Waskada
- Application
- Survey Plan
- Well List
- Gas Analysis
- Plot Plan
- Flow Diagram
- Cover Letter
- Emissions Summary
- so2 Emissions Summary
Surge Energy Inc. Battery Permit Application 16-03-02-26
- Application
- Battery Survey
- Flow Schematic
- Plot Plan
- Substance Analysis
- Dispersion Modeling
- Wells and Facilities
Antler River 02-29-02-28 Battery Application
Relative Resources Ltd. Battery Application 2A-18-09-28 WPM
- Battery Application
- Wellsite Survey
- Ortho Photo
- Landowner Consultation letter
- Gas Analysis
- Air Dispersion Model
- Dispersion Graph
- Air Dispersion Input Criteria
- Plot Plan & Flow Schematic
Molopo Battery Application 9-32-01-28 WPM
- Battery Application
- Appendix A - Surveys
- Appendix C - Calculations for Flared Gas Volumes
- Appendix D - Gas Analysis
- Appendix E - Dispersion Analysis
- Appendix F - Plot Plan
- Appendix G - Process Flow Diagrams