Index for Standard Construction Specifications |
Number |
Date |
File Size (pages) |
|
| General Conditions |
100 |
March 2002 |
100 KB (22) |
| Construction Order General Conditions |
110 |
March 2002 |
96 KB (22) |
| Provisions For: |
| - Liquidated Damages |
130 |
March 2002 |
19 KB (3) |
| - Interim Payments |
140 |
January 2008 |
9 KB (2) |
| - Fuel Cost Adjustments |
160 |
April 2006 |
23KB(1) |
| Weigh Scales |
170 |
June 1998 |
10 KB (2) |
| Field Laboratories |
180 |
March 2002 |
621 KB (5) |
| Traffic |
| Traffic Control |
200 |
March 2002 |
54 KB (12) |
| Dust Control |
220 |
June 2000 |
6 KB (1) |
|
top of page
|
|
| Clearing and Grubbing |
| Clearing and Grubbing |
300 |
July 2003 |
11 KB (2) |
| Clearing |
310 |
March 1986 |
9 KB (1) |
| Grubbing |
320 |
March 1986 |
6 KB (1) |
| Forest Service Provisions |
330 |
April 1970 |
10 KB (1) |
| Removing Ornamental Trees |
340 |
April 1970 |
5 KB (1) |
|
| Removing Culverts and Placing Culverts |
400 |
March 2002 |
32 KB (6) |
| Jacking Culverts Through Embankments |
410 |
January 2008 |
22 KB (7) |
| Grading |
| Grading |
500 |
January 2008 |
77 KB (18) |
| Boulevard Earth Fill |
510 |
March 1986 |
5 KB (1) |
| Granular Fill |
520 |
March 1986 |
10 KB (1) |
| Towing |
530 |
March 1986 |
5 KB (1) |
| Seeding |
*540(I) |
February 2001 |
10 KB (1) |
| Gravelling |
| Lease Agreement for Stockpiling Site |
-- |
-- |
13 KB (2) |
| Stockpiling Aggregates |
600 |
June 1998 |
17 KB (4) |
| Supplying and Depositing Aggregates |
610 |
March 2002 |
16 KB (3) |
| Base Course |
| Granular Base Course |
700 |
January 2008 |
42 KB (9) |
| Pavement |
| Bituminous Pavement and Recycled Bituminous Pavement |
800 |
March 2002 |
55 KB (14) |
| Applying Prime Coat, Blotter Sand and Tack Coat |
805 |
January 2008 |
20 KB (5) |
| Removing Asphalt Pavement |
810 |
March 1986 |
5 KB (1) |
| Reclaiming Bituminous Pavement |
815 |
May 1997 |
12 KB (3) |
| Asphalt Curb |
820 |
March 1986 |
6 KB (1) |
| Asphalt Surface Treatment |
825 |
March 2002 |
13 KB (3) |
| Concrete Pavement |
830 |
July 2003 |
53 KB (12) |
| Concrete Curbing |
860(I) |
August 2008 |
60 KB (8) |
| Construction of Sidewalks |
870 |
March 1986 |
11 KB (2) |
| Removing Concrete Curb |
880 |
March 1986 |
5 KB (1) |
| Removing Concrete Pavement |
890 |
March 1986 |
5 KB (1) |
| Aggregate |
| for Granular Base Course |
900 |
March 2002 |
20 KB (5) |
| for Traffic Gravel |
910 |
March 2002 |
13 KB (3) |
| for Bituminous Pavement |
920 |
January 2008 |
31 KB (7) |
| for Portland Cement Concrete |
930 |
March 1986 |
16 KB (4) |
| for Seal Coat Cover |
940 |
January 2001 |
11 KB (2) |
|
top of page
|
|
| Excavation |
| Excavation for Structures |
1000 M |
May 1984 |
24 KB (9) |
| Supplying Granular Backfill |
1001 M |
February 1982 |
6 KB (1) |
| Supplying and Placing Granular Backfill |
1002 M |
February 1982 |
8 KB (1) |
| Supplying Coarse Granular Backfill |
1003 M |
February 1982 |
6 KB (1) |
| Supplying and Placing Drainfill |
1004 M |
February 1982 |
7 KB (2) |
| Supplying and Placing Subsurface Drainage Fill |
1005 M |
January 1981 |
5 KB (1) |
| Piles |
| Driving Treated Timber Piles |
1010 M |
January 1981 |
10 KB (3) |
| Driving Steel Bearing Piles |
1012 M |
January 1981 |
14 KB (3) |
| Driving Steel Pipe Piles |
1014 M |
May 1984 |
17 KB (4) |
| Driving Precast Concrete Piles |
1016 M |
May 1984 |
18 KB (4) |
| Placing Cast-In-Place Concrete Piles |
1018 M |
January 1981 |
9 KB (3) |
| Demolition |
| Demolition and Removal of Existing Concrete Structures |
1020 M |
January 1981 |
7 KB (1) |
| Dismantling and Salvaging of Existing Structures |
1021 M |
January 1981 |
9 KB (2) |
| Timber |
| Construction of Treated Timber Structures |
1025 M |
May 1984 |
15 KB (4) |
| Concrete |
| Reinforced Concrete |
1030 M |
May 1984 |
39 KB (14) |
| Ready-Mix Concrete |
1031 M |
January 1981 |
10 KB (3) |
Reinforced Concrete Deck Slabs, Approach Slabs,
Rigid Frames, End Newel Posts, Curbs, Sidewalks, and Medians |
1032 M |
May 1984 |
18 KB (6) |
| Underwater Concrete |
1035 M |
May 1984 |
30 KB (8) |
| Prestressed Concrete |
| Fabrication of Precast Prestressed Concrete Girders |
1040 M |
May 1984 |
43 KB (15) |
| Erection of Precast Prestressed Concrete Girders |
1041 M |
May 1984 |
10 KB (3) |
Lateral Stressing, Placing of Anchor Rods and
Miscellaneous Grouting |
1042 M |
May 1984 |
18 KB (5) |
| Enclosing and Heating |
1043 M |
May 1984 |
13 KB (3) |
| Cast-In-Place Prestressed Post Tensioned Concrete |
1044 M |
January 1981 |
39 KB (11) |
| Fabrication of Precast Reinforced Concrete Box Culverts |
1045 M |
May 1984 |
21 KB (5) |
| Erection of Precast Reinforced Concrete Box Culverts |
1046 M |
May 1984 |
19 KB (5) |
| Waterproofing and Paving |
| Asphalt Waterproofing |
1050 M |
January 1981 |
6 KB (1) |
| Asphalt Paving on Bridges |
1052 M |
May 1984 |
24 KB (8) |
| Hot Poured Rubberized Asphalt Waterproofing |
1055 M |
May 1984 |
8 KB (2) |
| Bituminous Seal Coating of Bridges |
1056 M |
May 1984 |
14 KB (4) |
| Steel |
| Supply and Fabrication of Structural Steel |
1060 M |
May 1984 |
53 KB (15) |
| Erection of Structural Steel |
1061 M |
February 1982 |
35 KB (8) |
| Placing Miscellaneous Metal |
1062 M |
May 1984 |
12 KB (4) |
| Placing Steel Beam Guardrailing |
1064 M |
January 1981 |
5 KB (1) |
| Painting |
| Shop Painting Structural Steel |
1070 M |
February 1982 |
23 KB (7) |
| Field Painting |
1071 M |
January 1981 |
15 KB (3) |
| Structural Plate Pipes |
Supply and Installation of Structural Plate
Corrugated Steel Pipes |
1075 M |
May 1984 |
15 KB (5) |
Supply and Installation of Extensions to
Corrugated Structural Steel Plate Pipes |
1076 M |
May 1984 |
23 KB (6) |
| Rip-Rap |
| Sandbag Rip-Rap |
1080 M |
January 1981 |
10 KB (2) |
| Oversized Sandbag Rip-Rap |
1081 M |
January 1981 |
8 KB (2) |
| Precast Concrete Rip-Rap |
1084 M |
May 1984 |
9 KB (3) |
| Bridge Miscellaneous |
| Installation of Telephone and Electrical Conduits |
1090 M |
May 1984 |
7 KB (2) |
| Supply of Field Office |
1095 M |
May 1984 |
7 KB (2) |
|
top of page
|
|
| Strip Vertical Aerial Photography |
1262 |
March 1991 |
9 KB (1) |
| Supply and Application of Dust Control |
1280 |
March 2008 |
31 KB (7) |
| Supply and Delivery of Corrugated Steel Culverts |
1285 |
May 1997 |
27 KB (6) |
| Supply and Delivery of Precast Concrete Culverts |
1290 |
February 2001 |
41 KB (8) |
| Erosion Control |
| Supply and Installation of Geotextile Fabric |
1295 |
June 2000 |
17 KB (3) |
| Supply and Place Silt Fence Barrier |
1296 |
January 2001 |
12 KB (2) |
| Stone Rip-Rap |
1297 |
July 2003 |
12 KB (2) |
| Supply and Place Erosion Control Blanket |
*1298(I) |
February 2001 |
11 KB (1) |
|
top of page
|